When Every Party Has a Reason to Make Waste-to-Hydrogen Infrastructure Work

October 12, 2026

Category

Lessons from the waste-to-hydrogen at Sarimukti in West Java
Written by: Sugiyanto, Senior Associate, Monitoring, Evaluation, Result and Learning (MERL)

A green infrastructure project can have the right technology, a strong climate rationale and potential investment, and still struggle to move forward. 

The challenge is often not the technology; it is alignment. Projects that sit across energy, waste, environment and local development bring together stakeholders with different responsibilities, incentives and concerns. A national regulator may prioritize safety and policy compliance. A local government may focus on reliable waste services. Businesses need predictable supply and viable markets. Communities and workers may be most concerned about health, safety and livelihoods. 

These interests do not need to be identical. But stakeholders need sufficient common ground to act together.

The Global Green Growth Institute (GGGI) is helping build the foundations for waste-based biohydrogen development.  The work brings together policy analysis, technical standards, project preparation, and partnerships to support the responsible development of waste-based Biomethane and Hydrogen in Indonesia. 

At the 43.44-hectare Sarimukti Landfill in West Java, GGGI’s work provides a practical lens for understanding what it takes to bring different stakeholders together around a new energy opportunity and while addressing the environmental, social and economic priorities that shape its implementation. 

The same project can mean very different things to different stakeholders. The Sarimukti stakeholder analysis mapped 128 institutions across the emerging waste-to-hydrogen ecosystem and examined 30 priority stakeholders whose decisions, interests and influence could materially enable or constrain the pilot. The analysis showed that the challenge is not simply the number of actors involved, but the different institutional lenses through which they view the same project. 

This illustrates three important points: 

At Sarimukti, for example, implementation cuts across energy regulation, environmental permitting, forest-area tenure, public asset governance, interprovincial biomethane transport, safety, and commercial offtake. Each of these areas falls under the jurisdiction of different institutions, is governed by distinct regulatory frameworks and policy logics, and is driven by different incentives. 

The question, then, is not how to make everyone want the same thing. It is where different interests can find enough common ground to cooperate. 

Co-benefits create that common ground 

One way to identify this common ground is to look beyond the project’s primary technical output. A waste-to-hydrogen initiative can potentially create value across several dimensions:

These benefits matter differently to different stakeholders. For example, methane mitigation may be a climate outcome for a development partner, an environmental benefit for a regulator, an operational-risk reduction for local government and a potential health and safety benefit for nearby communities. 

This is the practical value of co-benefits: one intervention can provide different reasons for different stakeholders to participate. Alignment does not mean eliminating differences. Commercial uncertainty, regulatory concerns and social risks will remain. Co-benefits simply make the potential value of cooperation more visible.  

Building alignment into project design

The lesson from the Sarimukti analysis extends beyond waste-to-hydrogen. For complex green infrastructure, stakeholder alignment can be treated as part of project design—not simply as a consultation activity. 

The key question is therefore not only: What benefits can this project create? But which benefits matter to whom—and can they create enough shared value for different actors to move together? 

 

 

Methodological note: The co-benefit analysis considers both benefits associated with the proposed pilot and wider waste-management transition pathways. Some system-level benefits, including those associated with expanded organic-waste diversion and source separation, should therefore be understood as opportunities for complementary action rather than benefits attributable solely to the waste-to-hydrogen pilot. 

Sources: GGGI (2026), GGGI internal analysis; GGGI (2026), Navigating Complexities for Biohydrogen Pilots: A Stakeholder and Co-Benefit Analysis of Potential Biohydrogen Pilot. 